Boiler Controller
Our boiler controllers are designed to control a variety of boiler units and systems. Whether you need control for staged or modulating boilers, single or multiple pumps, Prolon has you covered plus a variety of efficiency strategies for you to choose from.
-
C1050
- Standalone or networked operation
- Proportional+Integral (PI) control loops maximize performance
- Built-in protection sequences with configurable temperature limits and minimum delays
- 3 analog, 1 digital inputs
- 4 digital, 1 analog outputs with self-resetting fuses
- Quick and easy installation using detachable numbered terminal blocks
- Control up to 2 boiler stages with or without 3 way valve
- Control 1 modulating boiler with optional backup stage
- Pump activity based on outside temperature or call for heat (or both)
- Configurable pump exercise sequence for extended periods of inactivity
- Supply water setpoint reset based on outside temperature
- Various lead-lag sequences for the pumps and boilers
- Reset the supply water setpoint based on a network received demand or occupancy
- Digital Outputs have selectable Sync/Source switches
M2000
- Standalone or networked operation
- Proportional+Integral (PI) control loops maximize performance
- Built-in protection sequences with configurable temperature limits and minimum delays
- 9 universal inputs
- 5 digital, 3 analog outputs with self-resetting fuses
- Quick and easy installation using detachable numbered terminal blocks
- Control up to 4 boiler stages with or without 3 way valve
- Control up to 2 modulating boilers with optional backup stage
- Pump activity based on outside temperature or call for heat (or both)
- Configurable pump exercise sequence for extended periods of inactivity
- Supply water setpoint reset based on outside temperature
- Various lead-lag sequences for the pumps and boilers
- Reset the supply water setpoint based on a network received demand or occupancy
- Optional control sequences for a 3-way valve or modulating boiler with backup
- Dedicated input that deactivates all boilers upon contact closure
- Dedicated input that requests maximum heat setpoint upon contact closure
- Internal time clock with 7-day configurable schedule and holiday calendar
- Hand/Off/Auto switches on all 8 outputs
-
Specifications
C1050
- Standalone or networked operation
- Proportional+Integral (PI) control loops maximize performance
- Built-in protection sequences with configurable temperature limits and minimum delays
- 3 analog, 1 digital inputs
- 4 digital, 1 analog outputs with self-resetting fuses
- Quick and easy installation using detachable numbered terminal blocks
- Control up to 2 boiler stages with or without 3 way valve
- Control 1 modulating boiler with optional backup stage
- Pump activity based on outside temperature or call for heat (or both)
- Configurable pump exercise sequence for extended periods of inactivity
- Supply water setpoint reset based on outside temperature
- Various lead-lag sequences for the pumps and boilers
- Reset the supply water setpoint based on a network received demand or occupancy
- Digital Outputs have selectable Sync/Source switches
M2000
- Standalone or networked operation
- Proportional+Integral (PI) control loops maximize performance
- Built-in protection sequences with configurable temperature limits and minimum delays
- 9 universal inputs
- 5 digital, 3 analog outputs with self-resetting fuses
- Quick and easy installation using detachable numbered terminal blocks
- Control up to 4 boiler stages with or without 3 way valve
- Control up to 2 modulating boilers with optional backup stage
- Pump activity based on outside temperature or call for heat (or both)
- Configurable pump exercise sequence for extended periods of inactivity
- Supply water setpoint reset based on outside temperature
- Various lead-lag sequences for the pumps and boilers
- Reset the supply water setpoint based on a network received demand or occupancy
- Optional control sequences for a 3-way valve or modulating boiler with backup
- Dedicated input that deactivates all boilers upon contact closure
- Dedicated input that requests maximum heat setpoint upon contact closure
- Internal time clock with 7-day configurable schedule and holiday calendar
- Hand/Off/Auto switches on all 8 outputs
- Documentation
- Download